Calculating Leakages

Please use a decimal point and not a comma to indicate the decimal place!

The green rows indicated contain results.

  • SI - Units
  • US - Units
  • Calculating by venting the air receiver
  • Calculating by measuring the cut-in period of the compressor
  • Air receiver volume
    Measurement period
    min
    Initial receiver pressure
    bar
    Final receiver pressure
    bar
    Motor power at maximum pressure
    kW
    Motor efficiency
    %
    Delivery at max. working pressure
    m³/min
    Power costs
    $/kWh
    Operating hours/year
    h
    Motor power consumption
    kW
    Leakage costs/year
    $
    Leakage rate
    m³/min
    Leakage percent
    %
Product Catalog